| CHECK HARNESS. |
|
Use a tester to measure the voltage between the relay holder and chassis ground. Connector & terminal (F9) No. 7 (+) — Chassis ground (−): (F9) No. 5 (+) — Chassis ground (−): (B473) No. 1 (+) — Chassis ground (−): (B473) No. 2 (+) — Chassis ground (−): (B473) No. 6 (+) — Chassis ground (−): (B473) No. 7 (+) — Chassis ground (−): (B473) No. 11 (+) — Chassis ground (−): (B473) No. 12 (+) — Chassis ground (−): |