CONTROL SYSTEMS > AT Shift Lock Solenoid and “P” Range Switch

INSPECTION

STEPCHECKYESNO

1.CHECK SHIFT LOCK SOLENOID.

Measure the resistance of shift lock solenoid connector terminals.

Terminals

No. 4 — No. 3:

Is the resistance 19.8 — 24.2 Ω?

Replace the shift lock solenoid.

2.CHECK SHIFT LOCK SOLENOID.

Connect the battery to shift lock solenoid connector terminal, and then operate the solenoid.

Terminals

No. 3 (+) — No. 4 (−):

Does the shift lock solenoid operate normally?

Replace the shift lock solenoid.

3.CHECK “P” RANGE SWITCH.

1) Move the select lever to “P” range.

2) Measure the resistance between “P” range switch connector terminals.

Terminals

No. 1 — No. 2:

Is the resistance less than 1 Ω?

Replace the “P” range switch.

4.CHECK “P” RANGE SWITCH.

1) Set the select lever to other than “P” range.

2) Measure the resistance between “P” range switch connector terminals.

Terminals

No. 1 — No. 2:

Is the resistance 1 MΩ or more?

Normal

Replace the “P” range switch.