EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4SO) > Purge Control Solenoid Valve

INSTALLATION

Install in the reverse order of removal.

NOTE:

Connect the evaporation hose as shown in the figure.

(A)

To fuel pipe (intake manifold)

(B)

To fuel pipe (evaporation line)

Refer to the following figure for the mounting hole of the purge control solenoid valve because the location differs according to intake manifold specification.

(A)

Without model number

(B)

With model number

See the following figure to check if the intake manifold has a model number.

(A)

Model number (single digit number)

Tightening torque:

19 N·m (1.9 kgf-m, 14.0 ft-lb)