4) Measure the voltage between ECM and chassis ground while operating the purge control solenoid valve.
NOTE:
Purge control solenoid valve operation can be executed using Subaru Select Monitor. For procedure, refer to “Compulsory Valve Operation Check Mode”. 
Connector & terminal
(B134) No. 8 (+) — Chassis ground (−):