CHECK HARNESS BETWEEN WASTEGATE CONTROL SOLENOID VALVE AND ECM CONNECTOR.

1) Turn the ignition switch to OFF.

2) Disconnect the connectors from wastegate control solenoid valve and ECM.

3) Measure the resistance of harness between wastegate control solenoid valve connector and engine ground.

Connector & terminal

(B127) No. 1 — Engine ground:

QUESTION

Is the resistance less than 10 Ω?

Yes No

Repair ground short circuit of harness between ECM and wastegate control solenoid valve connector.