AUTOMATIC TRANSMISSION(4AT) > Front Differential Assembly

INSTALLATION

1. Install the differential assembly to the converter case.

NOTE:

Do not damage the inside of the converter case (especially the mating surface of the differential side retainer).

(A)

Differential ASSY

2. Install the O-ring to the left and right side differential side retainer.

3. Using the ST, install the side retainer.

ST    499787000 WRENCH ASSY

4. Adjust the backlash of the front differential.

5. Install the lock plate.

Tightening torque:

25 N·m (2.5 kgf-m, 18.1 ft-lb)

(A)

Lock plate

6. Install new seal pipe to converter case.

(A)

Seal pipe

7. Install the converter case to the transmission case.

8. Insert the inhibitor switch and transmission connector to the stay.

(A)

Transmission harness ASSY

(B)

Inhibitor switch harness

9. Install the ATF cooler pipe.

10. Install the oil charge pipe together with an O-ring.

11. Insert the input shaft while rotating it lightly by hand, and then check the amount of protrusion.

Normal protrusion A:

50 — 55 mm (1.97 — 2.17 in)

12. Install the torque converter clutch assembly.

13. Install the transmission assembly to the vehicle.