FUEL INJECTION (FUEL SYSTEMS)(H4SO) > Tumble Generator Valve Actuator

INSTALLATION

1. RH SIDE

Install in the reverse order of removal.

Tightening torque:

6 N·m (0.61 kgf-m, 4.4 ft-lb)

2. LH SIDE

Install in the reverse order of removal.

Tightening torque:

6 N·m (0.61 kgf-m, 4.4 ft-lb)